Sign In | Join Free | My enlightcorp.com
China Shenzhen Grande Electronic Co., Ltd logo
Shenzhen Grande Electronic Co., Ltd
To be the well-known PCBA Supplier around the world.
Active Member

2 Years

Home > PCBA >

Digital Equipment First PCBA | PCB Production and Assembly

Digital Equipment First PCBA | PCB Production and Assembly

Brand Name : greattong

Place of Origin : China

MOQ : 1pcs

Price : $2

Payment Terms : T/T

Delivery Time : 15-20 days

Packaging Details : Anti-static bag and compartmental packing

Material : FR4

Contact Now

Supplier: Shenzhen Grande Electronics
Layers: 4
PCB:FR-4/1.6mm, 1oz finished copper
Application: Digital Equipment First PCBA | PCB Production‎ and Assembly
Surface Treatment: ENIG
PCBA Lead time:2-3 weeks
Packing: Anti-static bag and compartmental packing
Twist: <0.75%


【Description】
1, PCBA turnkey solution for Digital Equipment First PCBA | PCB Production‎ and Assembly
2, PCB Assembly, PCB fabrication / PCB layout, PCB re-layout.
3, Electronic Manufacturing Service.
4, SMT&DIP&PTH&BGA.
5, Components Sourcing.
6, Quick PCBA prototype.
7, X-ray test, the Internal Circuit Test (ICT) , Function Test (FCT)
8, Sample and small batch order are accepted.


PCBA Service
Customer offers: Gerber file, PCB Specification, BOM and Assembly Drawing.
Full-turnkey PCBA: 1-30Layers PCB, Components Sourcing, SMT, PCBA testing, PCBA Aging test, PCBA Packing and PCBA Shipping.

PCBA Quality Assurance
1, Certifications: UL, SGS, TUV, BV, ROHS, ISO9001: 2008, TS16949: 2008
2, 7 lines dust-proof SMT lines and DIP lines.
3, All line workers wear anti-static and dust-proof clothing.
4, All operators should pass strictly training before they start work.
5, SMT Equipment:solder paste printer in Jidakang,, Mounter in Panasonic, Re-flow, Wave Soldering and Semi-auto DIP
6, PCBA Test Equipment: ORT, Constant temperature and humidity chamber,3D CMM,X-Ray.
7, PCBA Test:ICT, Functional Circuit Test and X-ray test.
8, Package Processed:
0402, 0603, 0805, 1206, 1608, 2125, 3216
Micro QFP 0.2mm
Flip-chip, BGA, Connectors
BGA Ball Pitch=0.2mm
9, Each workstation in accordance with the SOP
10, Materials:FR-4, FPC, Aluminum,High TG,Halogen-Free, HF, CEM-1, CEM-3, FR-1, 94-V0 and so on.
11, Material Brand:KB, SHENGYI, NANYA and so on.

PCBA Lead Time
PCBA prototype: 7-10 working days after contract signed and EQ confirmed.
Mass production: partial delivery according to the customer’s requirement.

Other information for PCBA
1, The mass production will be arranged after PCBA prototype confirmed.
2, Use Teflon adhesive tape to protect Mount Holes and GND Holes.
3, EPE is used to avoid impact and crash.
PCBA Standard Packing
Anti-static bag and compartmental packing


Quality Digital Equipment First PCBA | PCB Production and Assembly for sale

Digital Equipment First PCBA | PCB Production and Assembly Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Shenzhen Grande Electronic Co., Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)